Flowpeak ConsultingFlowpeak Logo Mark

Zoho implementation for Plastics and Rubber

Zoho for plastics and rubber: plan moulds, materials and production runs, and cost each job accurately.

Business process workflow

How plastics and rubber work flows in Zoho

Plan moulds, materials and production runs, and cost each job accurately.

Common problems we fix

  • Mould and machine usage is not tracked
  • Scrap and rejection cost is hidden
  • Order status is unclear to buyers

The process, step by step

  1. 1

    RFQ and quote

    Cost by material, cycle time and tooling.

  2. 2

    Tooling and moulds

    Track moulds, owners and maintenance.

  3. 3

    Material planning

    Raw material needs against orders.

  4. 4

    Production run

    Machine-wise output and rejection.

  5. 5

    Dispatch and invoice

    Packing, delivery and billing.

  6. 6

    Cost analysis

    Margin by product and customer.

Department by department

How every department of a plastics and rubber business works in Zoho

A plastics or rubber processor turns resin and compound into moulded, extruded or calendered parts against customer drawings and schedules. In Zoho sales, planning, the moulding floor, tool room, quality, stores, accounts and HR share one part master and one order, so resin, mould and machine data line up.

How the departments hand work to each other

Each arrow is a handover. Because every team works on the same Zoho records, the next department picks up the work without re-entering it.

  1. 1Sales and Customer Engineering to Production Planning: Sales orders and monthly schedules per part
  2. 2Sales and Customer Engineering to Tool Room and Mould Maintenance: Approved mould orders and part drawings
  3. 3Production Planning to Moulding and Extrusion Floor: Daily production orders
  4. 4Production Planning to Purchase, Stores and Dispatch: Resin and insert requirements
  5. 5Moulding and Extrusion Floor to Quality Assurance: Batches for inspection and first-off requests
  6. 6Moulding and Extrusion Floor to Tool Room and Mould Maintenance: Mould faults and shot counts
  7. 7Moulding and Extrusion Floor to Purchase, Stores and Dispatch: Finished goods booked to stock
  8. 8Tool Room and Mould Maintenance to Production Planning: Mould availability and blocks
  9. 9Tool Room and Mould Maintenance to Finance and Accounts: Tooling milestones ready to bill
  10. 10Quality Assurance to Purchase, Stores and Dispatch: Released batches cleared for dispatch
  11. 11Quality Assurance to Moulding and Extrusion Floor: Process corrections from complaints
  12. 12Purchase, Stores and Dispatch to Finance and Accounts: Supplier bills and dispatch details for invoicing
  13. 13Finance and Accounts to Management and Reporting: Monthly profit, margin and cash
  14. 14HR and Payroll to Finance and Accounts: Payroll and statutory dues
  15. 15Management and Reporting to Sales and Customer Engineering: Capacity available and pricing guidance
  16. 16Management and Reporting to Production Planning: Priorities for late customers

Each department in detail

Open a department to see its workflow, its own entity diagram, who does the work, what needs approval, the reports it watches and what it hands over.

Sales and Customer EngineeringWins part business from OEMs and brand owners and sets realistic prices, tooling terms and schedules.

Workflow

  1. 1

    Receive RFQs

    RFQs with drawings, material grade and annual volume are logged as deals in Zoho CRM with files attached.

  2. 2

    Cost the part

    The estimator works out shot weight, cavities, cycle time, resin cost and machine rate to build the piece price.

  3. 3

    Quote part and tooling

    Quotes show piece price, mould cost, resin price basis and the formula for resin price changes.

  4. 4

    Get samples approved

    First samples and PPAP or sample reports go to the customer and approval is recorded before mass production.

  5. 5

    Receive schedules

    Purchase orders and monthly delivery schedules are entered as sales orders.

Entity diagram: Sales and Customer Engineering

The records this team creates and updates, their key fields, and how they link.

costed in (1:1)prices (1:N)becomes (1:N)RFQCRMPart nameMaterial gradeAnnual volumePart CostingCreatorShot weightCavitiesCycle timePiece costQuoteCRMPiece priceMould costResin basisSales OrderInventoryPO noSchedule monthQty
  • Zoho CRM
  • Zoho Creator
  • Zoho Inventory
Read the relationships as text
  • RFQ costed in Part Costing (1:1)
  • Part Costing prices Quote (1:N)
  • Quote becomes Sales Order (1:N)
Who does the work
  • Sales engineer
  • Cost estimator
  • Sales head
Approvals and controls
  • Quotes below target margin need sales head approval
  • Resin price escalation claims to customers are approved by management before sending
Reports they watch
  • RFQ pipeline by customer and status
  • Quote win rate
  • Monthly schedule against capacity
Hands over to
  • Production Planning: Sales orders and monthly schedules per part
  • Tool Room and Mould Maintenance: Approved mould orders and part drawings
Production PlanningLoads moulds onto the right machines and plans resin so schedules are met with minimum changeovers.

Workflow

  1. 1

    Explode the schedule

    Customer schedules are converted into production quantities per part after stock is netted off.

  2. 2

    Match mould to machine

    Each part is planned on a press whose tonnage and shot size suit its mould.

  3. 3

    Plan resin and masterbatch

    Resin, masterbatch and inserts are calculated from the bill of materials and shortages are flagged.

  4. 4

    Release production orders

    Daily production orders go to the floor with machine, mould, shift and target quantity.

Entity diagram: Production Planning

The records this team creates and updates, their key fields, and how they link.

runs (1:N)used in (1:N)needs (1:N)Production OrderCreatorPartMachineMouldTarget qtyMachineCreatorPress noTonnageStatusMouldCreatorMould noCavitiesShot countMaterial PlanInventoryResin gradeRequired kgShortage
  • Zoho Creator
  • Zoho Inventory
Read the relationships as text
  • Machine runs Production Order (1:N)
  • Mould used in Production Order (1:N)
  • Production Order needs Material Plan (1:N)
Who does the work
  • Production planner
  • PPC manager
Approvals and controls
  • Running a mould on a press outside its approved list needs PPC manager and quality approval
Reports they watch
  • Machine loading for the week
  • Schedule adherence per customer
  • Resin requirement versus stock
Hands over to
  • Moulding and Extrusion Floor: Daily production orders
  • Purchase, Stores and Dispatch: Resin and insert requirements
Zoho apps for this team:Zoho CreatorZoho Inventory
Moulding and Extrusion FloorRuns presses and lines to plan, records output, rejects and downtime every shift.

Workflow

  1. 1

    Set up the mould

    The setter loads the mould and process sheet with temperatures, pressures and cycle time.

  2. 2

    Approve first-off

    The first shots are checked by quality before the run is released.

  3. 3

    Log hourly output

    Operators record good parts, rejects by defect such as short shot, flash or sink, and downtime by reason.

  4. 4

    Handle regrind

    Runners and rejects are ground and the regrind percentage is recorded against the batch.

  5. 5

    Book finished goods

    Packed good parts are booked into finished stock with batch labels.

Entity diagram: Moulding and Extrusion Floor

The records this team creates and updates, their key fields, and how they link.

governs (1:N)records (1:N)records (1:N)Shift ProductionCreatorDateShiftGood qtyReject qtyProcess SheetCreatorMelt tempPressureCycle timeDowntimeCreatorReasonMinutesMachineReject LogCreatorDefectQtyAction
  • Zoho Creator
Read the relationships as text
  • Process Sheet governs Shift Production (1:N)
  • Shift Production records Downtime (1:N)
  • Shift Production records Reject Log (1:N)
Who does the work
  • Machine operator
  • Mould setter
  • Shift supervisor
Approvals and controls
  • Process parameter changes outside the approved window need quality approval
  • Production starts only after first-off approval
Reports they watch
  • OEE by machine and shift
  • Reject rate by defect and part
  • Downtime by reason
Hands over to
  • Quality Assurance: Batches for inspection and first-off requests
  • Tool Room and Mould Maintenance: Mould faults and shot counts
  • Purchase, Stores and Dispatch: Finished goods booked to stock
Zoho apps for this team:Zoho CreatorZoho Inventory
Tool Room and Mould MaintenanceBuilds, maintains and repairs moulds and dies so they run without breakdowns.

Workflow

  1. 1

    Track new mould builds

    New moulds are tracked as projects with design, machining, trial and approval stages.

  2. 2

    Schedule preventive maintenance

    Moulds are serviced after a set shot count and blocked from planning when due.

  3. 3

    Repair breakdowns

    Mould damage from the floor becomes a repair job with cause and spares used.

  4. 4

    Record ownership

    Customer-owned moulds are recorded with ownership and insurance details.

Entity diagram: Tool Room and Mould Maintenance

The records this team creates and updates, their key fields, and how they link.

undergoes (1:N)creates (1:1)Mould AssetCreatorMould noOwnerShot countPM dueMould RepairCreatorFaultHoursSparesMould BuildProjectsStageTrial dateStatus
  • Zoho Creator
  • Zoho Projects
Read the relationships as text
  • Mould Asset undergoes Mould Repair (1:N)
  • Mould Build creates Mould Asset (1:1)
Who does the work
  • Tool room engineer
  • Toolmaker
Approvals and controls
  • Modifications to customer-owned moulds need written customer approval
Reports they watch
  • Moulds due for maintenance
  • Mould breakdown hours
  • New mould build status
Hands over to
  • Production Planning: Mould availability and blocks
  • Finance and Accounts: Tooling milestones ready to bill
Quality AssuranceMakes sure every batch meets drawing, material and customer requirements before it ships.

Workflow

  1. 1

    Inspect incoming resin

    Resin lots are checked for MFI, moisture and certificate of analysis before use.

  2. 2

    Approve first-off and patrol

    First-off and patrol checks record dimensions and visual defects against the control plan.

  3. 3

    Release batches

    Final inspection releases or holds each batch, and held stock cannot be dispatched.

  4. 4

    Handle complaints

    Customer complaints are investigated with 8D reports and corrective actions.

Entity diagram: Quality Assurance

The records this team creates and updates, their key fields, and how they link.

part of (1:N)leads to (1:N)traces to (1:N)InspectionCreatorTypeBatchResultResin Lot TestCreatorLot noMFIMoistureBatch ReleaseCreatorBatchDecisionInspectorComplaint 8DCreatorCustomerDefectRoot cause
  • Zoho Creator
Read the relationships as text
  • Resin Lot Test part of Inspection (1:N)
  • Inspection leads to Batch Release (1:N)
  • Complaint 8D traces to Batch Release (1:N)
Who does the work
  • Quality inspector
  • Quality engineer
  • QA manager
Approvals and controls
  • Deviation or concession for out-of-spec parts needs customer approval
  • Held batches are released only by the QA manager
Reports they watch
  • Customer PPM by part
  • Batches on hold
  • Open 8D actions
Hands over to
  • Purchase, Stores and Dispatch: Released batches cleared for dispatch
  • Moulding and Extrusion Floor: Process corrections from complaints
Zoho apps for this team:Zoho CreatorZoho InventoryZoho Desk
Purchase, Stores and DispatchBuys resin, masterbatch and packing, controls stock by lot and ships on schedule.

Workflow

  1. 1

    Buy resin and consumables

    Purchase orders for resin grades, masterbatch, inserts and cartons are raised against plan.

  2. 2

    Receive by lot

    Each resin lot is received with its supplier lot number and certificate.

  3. 3

    Issue to machines

    Material is issued to production orders by lot so usage and wastage can be tracked.

  4. 4

    Dispatch to customer

    Released parts are packed, labelled and shipped with invoice and e-way bill or delivery note.

Entity diagram: Purchase, Stores and Dispatch

The records this team creates and updates, their key fields, and how they link.

receives (1:N)issued as (1:N)traces to (N:N)Material LotInventoryGradeLot noQty kgPurchase OrderInventoryPO noSupplierRate per kgMaterial IssueInventoryProduction orderQtyLotShipmentInventoryInvoice noQtyVehicle
  • Zoho Inventory
Read the relationships as text
  • Purchase Order receives Material Lot (1:N)
  • Material Lot issued as Material Issue (1:N)
  • Shipment traces to Material Lot (N:N)
Who does the work
  • Purchase executive
  • Storekeeper
  • Dispatch executive
Approvals and controls
  • Resin purchases above the plan quantity need PPC and purchase manager approval
  • Unreleased batches cannot be dispatched
Reports they watch
  • Resin stock and days of cover
  • Material yield per part
  • On-time dispatch by customer
Hands over to
  • Finance and Accounts: Supplier bills and dispatch details for invoicing
Finance and AccountsInvoices parts and tooling, tracks resin price changes and knows the real margin per part.

Workflow

  1. 1

    Invoice dispatches

    Sales invoices are raised from dispatch with GST in India or VAT in the UAE and UK.

  2. 2

    Bill tooling

    Mould costs are billed on milestones or amortised in the piece price as agreed.

  3. 3

    Handle resin price revisions

    Resin price changes are tracked and customer price revisions raised as debit or credit notes.

  4. 4

    Cost parts

    Actual resin, regrind, machine hours and rejects are compared with the quoted cost per part.

Entity diagram: Finance and Accounts

The records this team creates and updates, their key fields, and how they link.

adjusts (1:N)billed as (1:1)uses (1:N)InvoiceBooksInvoice noCustomerTaxTooling BillBooksMould noMilestoneAmountPrice RevisionCreatorResin indexEffective dateChange pctPart MarginAnalyticsPartActual costPrice
  • Zoho Books
  • Zoho Creator
  • Zoho Analytics
Read the relationships as text
  • Price Revision adjusts Invoice (1:N)
  • Tooling Bill billed as Invoice (1:1)
  • Part Margin uses Invoice (1:N)
Who does the work
  • Accounts executive
  • Cost accountant
  • Finance manager
Approvals and controls
  • Credit notes for price revisions need finance manager approval
Reports they watch
  • Receivables by customer
  • Margin per part and customer
  • Resin cost trend against price
Hands over to
  • Management and Reporting: Monthly profit, margin and cash
HR and PayrollStaffs three shifts, tracks attendance and overtime and pays operators and contract labour correctly.

Workflow

  1. 1

    Hire operators and setters

    Openings are tracked and skills such as mould setting are recorded on the employee.

  2. 2

    Roster shifts

    Operators are rostered across shifts and machines.

  3. 3

    Track attendance and overtime

    Biometric attendance and overtime feed payroll, with contract labour tracked separately.

  4. 4

    Run payroll

    Wages, shift allowance and overtime are paid in Zoho Payroll where it is available, or your local payroll provider.

Entity diagram: HR and Payroll

The records this team creates and updates, their key fields, and how they link.

records (1:N)assigned to (1:N)receives (1:N)EmployeePeopleNameSkillShiftAttendancePeopleDateInOutOvertimeShift RosterShiftsWeekShiftMachinePayslipPayrollMonthGrossNet
  • Zoho People
  • Zoho Shifts
  • Zoho Payroll
Read the relationships as text
  • Employee records Attendance (1:N)
  • Employee assigned to Shift Roster (1:N)
  • Employee receives Payslip (1:N)
Who does the work
  • HR executive
  • Payroll officer
Approvals and controls
  • Overtime beyond the weekly limit needs plant head approval
Reports they watch
  • Absenteeism by shift
  • Overtime hours and cost
  • Skill matrix coverage
Hands over to
  • Finance and Accounts: Payroll and statutory dues
Management and ReportingGives owners one view of OEE, rejects, schedule adherence and margin.

Workflow

  1. 1

    Combine data

    Production, quality, stores and accounts data sync into Zoho Analytics.

  2. 2

    Review daily

    The plant head reviews yesterday's OEE, rejects and dispatch each morning.

  3. 3

    Review monthly

    Monthly reviews cover customer PPM, resin yield and margin per part.

  4. 4

    Act on alerts

    Alerts for high rejects, late schedules and held stock go to managers in Cliq.

Entity diagram: Management and Reporting

The records this team creates and updates, their key fields, and how they link.

triggers (1:N)triggers (1:N)Plant KPIAnalyticsMetricTargetActualCustomer ScorecardAnalyticsCustomerPPMOn-timeAction ItemCreatorTopicOwnerDue
  • Zoho Analytics
  • Zoho Creator
Read the relationships as text
  • Plant KPI triggers Action Item (1:N)
  • Customer Scorecard triggers Action Item (1:N)
Who does the work
  • Managing director
  • Plant head
  • Finance head
Approvals and controls
  • New press or capacity investments are approved by the managing director
Reports they watch
  • OEE trend by machine
  • Customer PPM and on-time delivery
  • Margin per part
Hands over to
  • Sales and Customer Engineering: Capacity available and pricing guidance
  • Production Planning: Priorities for late customers
Zoho apps for this team:Zoho AnalyticsZoho FlowZoho Cliq

What to expect when you start

A typical plan for a focused project of one to three apps. Larger scope or messy data takes longer; we confirm the timeline after discovery.

  1. Week 1 to 2

    Map and agree

    We walk through your plastics and rubber process from "RFQ and quote" to "Cost analysis", list the records and fields you really need, and agree the scope.

  2. Week 3 to 4

    Build the core

    We configure Zoho CRM and Zoho Creator with your stages, roles, approvals and templates.

  3. Week 5 to 6

    Connect and migrate

    We clean and import your data, connect email, payments or other tools, and build the reports you will use every week.

  4. Week 7 to 8

    Test and go live

    Your team tests with real cases, we train each role, and we cut over with a checklist.

Mistakes to avoid

  • Copying the old spreadsheet column for column. Keep only the fields that help someone decide or act.
  • Leaving out exceptions such as returns, changes and cancellations. Model them early so the team does not work around the system.
  • No owner per stage. Name one person for "RFQ and quote" and one for "Cost analysis".
  • Going live without checking reports against numbers you already trust.

A good first win

Start with the problem that hurts most: Mould and machine usage is not tracked. Fixing one visible problem in the first month builds trust and adoption for everything after it.

What you can measure

  • Rejection rate
  • Machine utilisation
  • On-time delivery

Questions about Zoho for plastics and rubber

Which Zoho apps suit plastics and rubber businesses?

A typical plastics and rubber setup uses Zoho CRM, Zoho Creator, Zoho Inventory, Zoho Books, Zoho Analytics. We confirm the exact apps after mapping your own process in a discovery call.

How does the business process flow in Zoho for plastics and rubber?

1. RFQ and quote; 2. Tooling and moulds; 3. Material planning; 4. Production run; 5. Dispatch and invoice; 6. Cost analysis.

Which departments does a Zoho setup for plastics and rubber cover?

A full setup covers Sales and Customer Engineering, Production Planning, Moulding and Extrusion Floor, Tool Room and Mould Maintenance, Quality Assurance, Purchase, Stores and Dispatch, Finance and Accounts, HR and Payroll, Management and Reporting. Each department works in its own Zoho screens, but they share the same customer, order and finance records, so work moves from one team to the next without being retyped.

Zoho apps we set up for plastics and rubber

  • Zoho CRM
  • Zoho Creator
  • Zoho Inventory
  • Zoho Books

Not sure which apps fit your business? Book a free 30-minute call or see all Zoho products we implement

Book a free callWhatsApp